REFINERÍA DE CARTAGENA S.A.
Conceptual, basic and detailed engineering, studies, analysis and technical assistance for the designs of high and medium complexity in Cartagena's Refinery (Refinería de Cartagena S.A.)
PERIOD CONTRACT VALUE
March 2018 - December 2020 USD 1.844.758

Technical assistance in construction for the execution of Engineering Department´s initiatives, Cartagena's Refinery.
PERIOD CONTRACT VALUE
June 2018 - June 2019 USD 838.908
{"dots":"true","arrows":"true","effect":"slide"}
ECOPETROL S.A.
Basic and detailed engineering of the B4 Module for 75 wells distributed along 25 locations in Campo Rubiales, Ecopetrol S.A.
PERIOD CONTRACT VALUE
February - July 2018 USD 773,797

Basic engineering for the water expansion project to 40 acres of the Campo Chichimene Ecopetrol S.A.
PERIOD CONTRACT VALUE
March - July 2018 USD 494,942

Basic engineering for the optimization of the injection water treatment system in Campo Tello - south regional vice-presidency, ECOPETROL S.A.
PERIOD CONTRACT VALUE
April - August 2018 USD 233,354

Study development for lidar for 4000 hectares of Campo Lisama, ECOPETROL S.A.
PERIOD CONTRACT VALUE
July - October 2018 USD 154,082
Updating of the detailed engineering for the 42'' discharge line between the Acacias Station and the Guayuriba river owned by Ecopetrol S.A.
PERIOD CONTRACT VALUE
May - August 2017 USD 185,879

Extended basic engineering for the relocation of pilot plants and compliance of electric classification requirements of the pilot plants located in the ICP.
PERIOD CONTRACT VALUE
December 2017 - June 2018 USD 305,681

Detailed engineering for the additional development project - Tisquirama, Module 1, 13 wells, ECOPETROL S.A.
PERIOD CONTRACT VALUE
December 2017 - October 2018 USD 489,637

Analysis of integrated production systems, subsoil and surface soil, for assets of the Development & Production Vice-Presidency (VDP).
PERIOD CONTRACT VALUE
January - December 2018 USD 424,050
Conceptual engineering for the primary development of Palagua-Caipal.
PERIOD CONTRACT VALUE
November 2017 - January 2018 USD 220,569

Conceptual engineering for the development of Llanito Module-I (DLP), ECOPETROL S.A.
PERIOD CONTRACT VALUE
November 2017 - April 2018 USD 341,061

Pre-conceptual and conceptual engineering for the development project of the Campos Casabe, Casabe Sur and Peñas Blancas, ECOPETROL S.A.
PERIOD CONTRACT VALUE
December 2017 - March 2018 USD 184,120

Field engineering services for the projects of integral module, Chichimene station - injection pilots Chichimene - WF and Chichimene CEOR, ECOPETROL S.A.
PERIOD CONTRACT VALUE
December 2017 - April 2018 USD 275,486
{"dots":"true","arrows":"true","effect":"slide"}
CENIT TRANSPORTE Y LOGISTICA DE HIDOCARBUROS S.A.S ( ECOPETROL S.A)
Updating of detailed engineering for the fire protection system of the new processing areas in the Sebastopol plant (Sebastopol system, Medellín).
PERIOD CONTRACT VALUE
May - July 2019 USD 35.357

Realignment design from PK59+000 to PK62+000 for the gas pipeline Ayacucho - Coveñas 16" sector "El Banco" for Cenit.
PERIOD CONTRACT VALUE
July - September 2019 USD 223.371

Pilot for the updating of the pumping units system in Cenit's Monterrey Station.
PERIOD CONTRACT VALUE
August - October 2019 USD 69.585
 
{"dots":"true","arrows":"true","effect":"slide"}
ECOPETROL S.A. -MUSTANG COLOMBIA
Consulting, development of conceptual, basic and detailed engineering, technical assistance, supervision, control and audit for the improvements in the Caño Limón - Coveñas optimization and maximization program.
PERIOD CONTRACT VALUE
February 2011 - September 2013  USD 4.840.219

Consulting and conceptual, basic and detailed engineering for the projects in crudes evacuation from the Hurón fields in the Niscota block (Casanare), and projects in infrastructure for loading and unloading platforms in the Vasconia and Araguaney Stations, Barrancabermeja Refinery, Ayacucho, Castilla VIT, among others.
PERIOD CONTRACT VALUE
January - December 2014  USD 1.478.081
{"dots":"false","arrows":"true","effect":"fade"}
CONSORCIO COSACOL-COFURCA
Routing, evaluation and diagnosis of the right of way shared with Ecopetrol S.A for the construction of Gibraltar - Bucaramanga gas pipeline.  
PERIOD CONTRACT VALUE
January - March 2010  USD 50.000
 

 

 

Energy

{"dots":"true","arrows":"true","effect":"slide"}
ECOPETROL S.A.
Adaptations for the turbine air cooling systems of the centers for electric generation Termosuria and Termocoa, owned by the Orinoquia Regional Vice-Presidency, Ecopetrol S.A.
PERIOD CONTRACT VALUE
September - November 2016 USD 138.577
Basic conceptual engineering for electrification of wells at 34.5kV project and IPPPEL synchronization in Campo Rubiales.
PERIOD CONTRACT VALUE
July - November 2017 USD 245.388
Electrical standardization compliance in NPFA (RETIE for Colombia) for Campo Rubiales and Caño Sur.
PERIOD CONTRACT VALUE
May - November 2018 USD 490.451
 
{"dots":"true","arrows":"true","effect":"slide"}
CENIT TRANSPORTE Y LOGISTICA DE HIDOCARBUROS S.A.S ( ECOPETROL S.A)
Detailed engineering for the adequacy of the electric infrastructure of 17 plants owned by Cenit Transporte y Logística de Hidrocarburos S.A.S, part of Electric reliability and safety project.
PERIOD CONTRACT VALUE
June - October 2015 USD 415.429
 

 

 

Public Services and Public Work

{"dots":"true","arrows":"true","effect":"slide"}
EPM S.A. E.S.P.
Geological and geotechnical assistance for the "Playas" project.
PERIOD CONTRACT VALUE
January - March 2016 USD 5.385

Consulting for technical annex´s elaboration and market study for a design and construction contract related to the reconstruction of the machine room´s skip in "La Cascada" plant, owned by EPM S.A. E.S.P.
PERIOD CONTRACT VALUE
February - March 2016 USD 8.707

Detailed engineering, studies and design for the improvement of the tertiary road infrastructure project in the zones of influence of Salitre, Alto Lindo, Laureles and San Ignacio in the Aguazul municipality, Casanare.
PERIOD CONTRACT VALUE
February - June 2018 USD 221.998
 

 

 

Non-Industrial Infrastructure

{"dots":"true","arrows":"true","effect":"slide"}
ECOPETROL S.A.
Designs for the construction of facilities in the non-industrial infrastructure improvement project in Campo Rubiales, Ecopetrol S.A.
PERIOD CONTRACT VALUE
July - November 2017 USD 318.847

Detailed engineering for the construction of rural social housing for peace in the Arauquita municipality, Arauca.
PERIOD CONTRACT VALUE
July - December 2018 USD 152.705
{"dots":"true","arrows":"true","effect":"slide"}
CIRCULO DE SUBOFICIALES DE LAS FUERZAS MILITARES.
Vulnerability´s structural and geotechnical study regarding due to slope and water runoff at Hotel towers "La Palmara", owned by the military forces from the municipality of Melgar, Tolima.
PERIOD CONTRACT VALUE
August - November 2016 USD 23.451
 

 

 

Agroindustrial

{"dots":"true","arrows":"true","effect":"slide"}
YARA COLOMBIA S.A.
Technical studies and detailed engineering for the construction of containment dikes in the liquid ammonia storage tanks of the Ammonia plant Yara Colombia S.A in Cartagena, TK-30A (Cap: 3600 tons) and TK-30B (Cap:3600 tons).
PERIOD CONTRACT VALUE
July - October 2015 USD 81.644

Engineering services for the operational standarization plan in Yara Cartagena. Conceptual, basic and detailed engineering for the instrument-based security system for conveyor belts for NPK fertilizer and calcium nitrate (NICA) plant, in Yara Cartagena.
PERIOD CONTRACT VALUE
November 2015 - March 2016 USD 71.968

 

 

Integral Supply Service

{"dots":"true","arrows":"true","effect":"slide"}
REFINERÍA DE CARTAGENA S.A.
Technical assistance and expediting for materials supply at Cartagena´s Refinery.
PERIOD CONTRACT VALUE
December 2018 - June 2020 USD 1.269.669

Management of materials storage in Cartagena's Refinery.
PERIOD CONTRACT VALUE
March 2019 - June 2020 USD 2.555.997